0% 0% financing options available through GreenSky
(321) 639-1451 Schedule a Consultation

Pool Enclosure Permits in Brevard County

Which office issues your permit, what your contractor handles, what you handle, and how HOA approval fits in.

Call (321) 639-1451

0% Financing options through GreenSky. See financing. Subject to credit approval.

Start your estimate

Three quick questions

What would you like to build?
Where is your home?
Where should we call you?

Rather talk? Call (321) 639-1451

The short answer

By Advanced Aluminum, Cocoa, Florida. Updated .

Yes, a new pool enclosure needs a building permit in Brevard County, and so do patio enclosures and sunrooms. Which office issues it depends on whether your home is inside city limits: each city has its own building department, and unincorporated areas such as Merritt Island, Viera, Port St. John and Suntree go through Brevard County.

Your contractor pulls the permit and schedules the inspections. HOA approval is separate, and the HOA application comes from you.

Get this guide as a PDF

Keep a copy to read later or share with your family. Your download starts right away, and we'll email you a copy too.

We'll email the guide to this address and may follow up about your project. See our privacy policy for how we handle your details.

Do you need a permit?

In Brevard County, these projects need a building permit:

  • a new pool enclosure
  • a new patio enclosure or screen room
  • a sunroom
  • replacing an enclosure

Rescreens and repairs to an existing enclosure don’t need a permit.

We confirm which permits your project needs at your consultation, before you get a written price.

Which office issues your permit

Your mailing address doesn’t decide it; your city limits do. Plenty of homes with a Cocoa, Rockledge, Melbourne or Titusville mailing address are actually in unincorporated Brevard County. Here is how it breaks down across the areas we serve:

Permitting office by area. We confirm the office for your exact address.
Area Permitting office Notes
Palm Bay City of Palm Bay Building Division
Melbourne City of Melbourne Inside city limits. West Melbourne is its own city with its own building department
Suntree Brevard County Unincorporated
Titusville City of Titusville Inside city limits
Mims Brevard County Unincorporated
Merritt Island Brevard County Unincorporated. Waterfront lots may have seawall setbacks
Viera Brevard County Unincorporated. Most villages also have an HOA architectural review
Cocoa Beach City of Cocoa Beach Coastal wind-speed design zone
Rockledge City of Rockledge Some Rockledge addresses are unincorporated and go to the county
Satellite Beach City of Satellite Beach Coastal wind-speed design zone
South Patrick Shores Brevard County Unincorporated. Coastal wind-speed design zone
Port St. John Brevard County Unincorporated
Indian Harbour Beach City of Indian Harbour Beach Coastal wind-speed design zone
Melbourne Beach Town of Melbourne Beach Inside town limits. Coastal wind-speed design zone
Aquarina, Floridana Beach and the South Beaches Brevard County Unincorporated. Coastal wind-speed design zone
Cocoa City of Cocoa Inside city limits. Much of west Cocoa and Sharpes is unincorporated
Cape Canaveral City of Cape Canaveral Coastal wind-speed design zone

Not sure which side of the line you are on? Tell us your address and we will look it up.

Who handles what

A permit is a shared job, but most of it falls on the contractor. Here is how it splits on our projects:

Permit tasks on an Advanced Aluminum project.
Task Who does it Notes
Measure the site and design the enclosure Advanced Aluminum At your in-home consultation
Engineered drawings for your address Advanced Aluminum Designed for the wind speed and exposure at your home
Permit application Advanced Aluminum Filed with your city or Brevard County
Permit fees Included in our written price Set by each permitting office
Notice of Commencement Homeowner signs Required by Florida law for most projects over a set value. We prepare it and record it.
HOA or architectural review application Homeowner We give you the plans your HOA asks for
Scheduling inspections Advanced Aluminum
Access for inspectors Homeowner Gate codes, pets and so on
Final inspection and closing the permit Advanced Aluminum Then we walk the finished project with you

How the permit process works

For a new pool enclosure, the permit usually goes like this:

  1. Consultation and written price. We measure, talk through the options with you and give you a written price. Once you sign, we design the enclosure.
  2. Engineered drawings. The drawings show the frame, the connections, the footers and the wind design for your address.
  3. Application. We file the application with the right office.
  4. Plan review. The building department reviews the drawings. Sometimes it asks for changes or more detail, and we answer those.
  5. Permit issued. The permit is posted at the job site while the work is done.
  6. Final inspection. A typical pool enclosure permit needs one inspection, once the enclosure is finished. When it passes, the permit is closed.

How long this takes depends on the office and how busy it is. Plan review is often the longest wait, and it is outside the contractor’s control. About 30 days is typical, though it depends heavily on which office handles your address.

HOAs and architectural review

Many Brevard communities have a homeowners association with rules about enclosures: roof style, height, frame color, setbacks from the property line. HOA approval is separate from the building permit, and you need both.

Here is how it works with us. We design with your community’s architectural guidelines in mind and give you the plans and details your HOA asks for. You submit the application to your HOA, because its approval is between you and your community. In some communities, such as most villages in Viera, the HOA review comes before the county permit.

To keep things moving:

  • Find your HOA’s architectural guidelines before your consultation, and share them with us.
  • Ask your HOA how long its review usually takes and when its committee meets.
  • Keep a copy of the approval letter with your project paperwork.

Patio enclosures, sunrooms and repairs

The same offices handle permits for every kind of aluminum structure, but the drawings differ by project:

  • Pool enclosures: a screen frame over the pool and deck, engineered for wind and anchored to footers and the house.
  • Patio enclosures: a screen room, often with an insulated roof, attached to the house over a patio or slab. The roof adds its own engineering.
  • Sunrooms: glass-walled rooms with an insulated roof, built onto the house. A sunroom usually needs no permit beyond the building permit.
  • Repairs: repairs to an existing enclosure, such as new doors, screen or fasteners, don’t need a permit. Replacing an enclosure is new construction and does.

Whatever the project, we tell you at the consultation which permits it needs, and they are part of the plan before you see a price.

Coastal and waterfront lots

On the barrier island, enclosures must be engineered for the coastal wind-speed design zone. That changes the design and the drawings, not the permit steps. Waterfront lots on the Indian and Banana Rivers can also come with setback rules from the seawall that shape where the enclosure can go, especially on Merritt Island.

Our hurricane guide explains how wind design works for coastal homes.

Permit fees

Each permitting office sets its own fees, usually based on the value or size of the project. Fees change from time to time, so check the current schedule for your office. Permit fees are included in our written price.

Why an unpermitted enclosure is a problem

Skipping the permit can look like a shortcut, but it tends to cost more later. An unpermitted enclosure can cause trouble when you sell the house, because buyers’ inspectors and title companies look for open or missing permits. It can also come up with your insurer after a storm. In some cases the owner has to permit the work after the fact, which can mean opening it up for inspection, or take it down.

If a contractor suggests building without a permit, or asks you to pull it as an owner-builder, take that as a reason to keep looking.

Check your contractor's license

Make sure your contractor is licensed and insured. You can check a Florida contractor license in a minute on the DBPR website, myfloridalicense.com. Advanced Aluminum holds Florida License #AL0521, and we are fully insured with general liability and workers’ compensation. Every installer on your project is our own W2 employee, never a subcontractor.

See our process for every step from first call to final walkthrough, or the cost guide for what a permitted, engineered enclosure costs.

Questions and answers

Do I need a permit for a pool enclosure in Brevard County?

Yes. New pool enclosures, patio enclosures and sunrooms need a building permit from your city or from Brevard County, depending on your address. We take care of it as part of your project.

Do I need a permit to rescreen my pool enclosure?

No. A rescreen doesn’t need a permit.

Who pulls the permit?

Your contractor. On our projects, we prepare the engineered drawings, file the application and schedule the inspections.

Do you handle HOA approval?

We design with your HOA’s guidelines in mind and give you the plans it asks for. The HOA application itself comes from you.

Is Merritt Island permitted by the county or a city?

Merritt Island is unincorporated, so permits go through Brevard County.

Is Viera its own city?

No. Viera is unincorporated, so building permits go through Brevard County. Most Viera villages also have their own architectural review.

How long does a pool enclosure permit take?

It depends on the office and how busy it is. About 30 days is typical, though it depends heavily on which office handles your address.

See all FAQs

More guides

  • Pool enclosure cost guideWhat a pool enclosure costs in Brevard County, and what moves the price.
  • Hurricane guideHow enclosures are engineered for wind, and what to do before and after a storm.
  • Our processSix steps from your first call to the final walkthrough.

Plan your project

Tell us about your project, and we will set up a free in-home consultation and a written price.

(321) 639-1451

Start your estimate

Three quick questions

What would you like to build?
Where is your home?
Where should we call you?

Rather talk? Call (321) 639-1451

Call Now Get Estimate